NVIDIA AI Server OEM Comparison: Supermicro vs Dell vs HPE
NVIDIA AI Server OEM Comparison: Supermicro vs Dell vs HPE
Executive Summary
For rack-scale NVIDIA AI deployments, enterprises and cloud providers commonly procure complete systems from original equipment manufacturers (OEMs) and original design manufacturers (ODMs) that build around NVIDIA platforms, although NVIDIA also offers its own DGX systems. NVIDIA describes MGX as an open modular reference architecture, rather than a licensing program [1]. As of July 2026, the market for NVIDIA GB200 NVL72 and GB300 NVL72 rack-scale systems is dominated by a small group of branded OEMs, principally Dell Technologies, Supermicro, Hewlett Packard Enterprise (HPE), and Lenovo, alongside Taiwanese original design manufacturers Foxconn (Hon Hai Precision Industry), Quanta Cloud Technology (QCT), Wiwynn, and Wistron that build the bulk of hyperscaler-direct racks. According to IDC's Worldwide Quarterly Server Tracker as reported by Electronics Weekly, Dell Technologies claimed the top position in the first quarter of 2026 with a 16.5% worldwide server revenue share on $20.28 billion in quarterly revenue, up 244.1% year over year, while Super Micro Computer held second place with 7.6% share and Lenovo ranked third at 4.6% [2]. "ODM Direct" vendors, the unbranded Taiwanese manufacturers that sell straight to hyperscalers such as Meta, Microsoft, and Google, still controlled the largest single share of the market at 50.2%, though that was down from 64.1% a year earlier as branded OEMs captured a growing share of AI infrastructure spending [3].
Each OEM has converged on the same underlying NVIDIA silicon but differentiates on liquid-cooling engineering, supply chain scale, and services. Dell reported $64 billion in cumulative AI-optimized server orders for fiscal year 2026, with $25 billion shipped and a $43 billion backlog entering fiscal 2027, and raised its FY27 AI server revenue outlook to $60 billion after booking $24.4 billion in new AI orders in a single quarter [4] [5]. Supermicro, which built its reputation on early direct liquid cooling (DLC), posted $10.2 billion in fiscal third-quarter 2026 net sales with more than 80% of revenue tied to AI GPU platforms, though gross margin remained thin at 9.9% [6]. HPE's Cloud & AI segment revenue grew 22.9% year over year to $7.7 billion in its fiscal second quarter of 2026, with server revenue up 32.7% to $5.5 billion, and CEO Antonio Neri described the company's backlog as "record-breaking" [7] [8]. Foxconn, which assembles roughly 40% of global AI rack volume by its own chairman's account, reported a 40% jump in quarterly sales tied to AI server demand, with June 2026 revenue alone reaching approximately $45 billion [9].
The NVIDIA GB200 NVL72 connects 36 Grace CPUs and 72 Blackwell GPUs in a liquid-cooled, rack-scale design delivering 130 terabytes per second of NVLink bandwidth and up to 30x faster real-time trillion-parameter LLM inference than the prior H100 generation [10]. OEMs and ODMs build systems using NVIDIA platforms and, where applicable, NVIDIA's open MGX modular reference architecture. MGX is designed to let partners create tailored configurations rather than establish a uniform licensing arrangement for every rack platform [11]. Rising Vera Rubin rack prices, estimated at $5 million to $8.8 million and potentially higher as HBM4 memory costs climb, are compressing OEM margins even as unit revenue grows, since NVIDIA increasingly ships more pre-integrated content itself [12]. For buyers, the practical choice is rarely about raw GPU access, since all OEMs ship the same NVIDIA silicon, but about liquid-cooling maturity, delivery speed, services and financing, regional support, and each vendor's position in the order queue as Blackwell and Vera Rubin supply remains constrained through 2026 and into 2027.
Introduction and Background
When an enterprise, cloud provider, or government agency deploys NVIDIA graphics processing units (GPUs) at scale, it will commonly procure a complete rack-scale system—comprising GPUs, CPUs, memory, networking, power delivery, and liquid cooling—from a qualified server manufacturer. NVIDIA also offers its own DGX platforms [1]. This report examines the competitive landscape of NVIDIA AI server original equipment manufacturers (OEMs) as of July 2026, comparing Dell Technologies, Supermicro, Hewlett Packard Enterprise, Lenovo, and the Taiwanese original design manufacturers (ODMs), principally Foxconn (Hon Hai Precision Industry), Quanta Cloud Technology, and Wiwynn, that assemble the majority of hyperscaler-direct AI infrastructure.
The distinction between an OEM and an ODM matters for buyers. Branded OEMs such as Dell and HPE sell fully supported, serviced systems under their own name, typically to enterprises, sovereign governments, and mid-tier cloud providers that need integration services, financing, and a single point of accountability. ODMs such as Foxconn and Quanta build largely unbranded racks to a hyperscaler's own specifications, a category IDC terms "ODM Direct," and this segment still supplied 50.2% of worldwide server revenue in the first quarter of 2026 even as its share compressed from 64.1% a year earlier [3]. Total worldwide server market revenue reached $122.6 billion in the first quarter of 2026, up 30.4% year over year, with GPU-accelerated servers alone generating $68.9 billion, or 56.2% of the total [13].
The underlying hardware that all of these companies build around is NVIDIA's rack-scale reference architecture. The GB200 NVL72, introduced in 2024, connects 36 Grace CPUs and 72 Blackwell GPUs into a single liquid-cooled rack that functions as one giant GPU domain, delivering 130 TB/s of NVLink bandwidth [10]. Its successor, the GB300 NVL72, integrates 72 Blackwell Ultra GPUs and delivers up to 50x the AI factory output of Hopper-generation systems [14].NVIDIA provides platforms and an open MGX modular reference architecture that enables OEMs, ODMs, and ecosystem partners to build accelerated systems faster. MGX supports tailored configurations, so a shared NVIDIA platform does not make every OEM rack an identical system [15]. NVIDIA itself continues to post record results from this ecosystem: fiscal first-quarter 2027 (ended April 26, 2026) revenue reached $81.6 billion, up 85% year over year, with Data Center revenue of $75.2 billion, up 92% [16] [17]. This report walks through each major OEM's capabilities, adoption, and strengths and limitations, presents a feature comparison matrix, reviews available performance data, quantifies the market with data drawn from IDC, TrendForce, and public filings, profiles five named deployments, and concludes with implications for buyers navigating a still supply-constrained market.
Dell Technologies
Capabilities
Dell's AI server line centers on the PowerEdge XE9680, an air-cooled 6U server supporting eight NVIDIA HGX H100 or H200 GPUs, and the newer PowerEdge XE9712, a rack-scale, direct-liquid-cooled platform built around NVIDIA's GB200 and GB300 NVL72 architecture that unifies up to 72 Blackwell GPUs per rack with 1.8 TB/s of GPU-to-GPU NVLink bandwidth [18] [19]. Dell markets these as part of its Integrated Rack Scalable Systems (IRSS) program, which delivers fully built and pre-tested racks rather than individual servers, reducing customer integration time [20]. In June 2026, Dell became the first vendor to ship rack systems built on NVIDIA's next-generation Vera Rubin platform, delivering PowerEdge XE9812 servers in a Dell PowerRack configuration to CoreWeave, which Dell says delivers up to 10x lower cost per token than Grace Blackwell NVL72 for large-scale agentic inference [21]. Dell's AI Data Platform additionally bundles unstructured data engines built with Elasticsearch and a federated SQL engine from Starburst, positioning the offering as a full-stack AI factory rather than raw compute alone [22].
Adoption
Dell's Infrastructure Solutions Group (ISG) posted record full-year fiscal 2026 revenue of $60.8 billion, up 40% year over year, and record quarterly ISG revenue of $19.6 billion in the fourth quarter, up 73% [23]. Across fiscal 2026, Dell closed more than $64 billion in AI-optimized server orders, shipped over $25 billion, and entered fiscal 2027 with a record $43 billion backlog, according to COO Jeff Clarke [24]. Momentum accelerated further in the first quarter of fiscal 2027 (ended roughly May 2026), when Dell booked $24.4 billion in new AI orders, recognized $16.1 billion of AI server revenue, and raised its FY27 AI server revenue guidance to $60 billion, with total ISG revenue up 181% year over year to $29 billion [25] [26]. In IDC's Q1 2026 vendor tracker, Dell held the number-one position in the overall server market with a 16.5% revenue share, more than double any other named vendor [27]. Dell's marquee AI infrastructure customer is CoreWeave, the AI-focused cloud provider, which received the first Dell PowerEdge XE9712 GB200 NVL72 racks in December 2024, the first GB300 NVL72 racks in mid-2025, and the first Vera Rubin-based PowerRack systems in June 2026 [28] [29]. Dell was also confirmed by Elon Musk and Michael Dell as one of two server suppliers, alongside Supermicro, for xAI's Colossus supercomputer in 2024 [30].
Strengths and Limitations
Dell's principal strength is scale combined with enterprise sales and services reach: its $43 billion backlog and status as the first vendor to ship each successive NVIDIA rack generation, GB200, GB300, and Vera Rubin, to a major cloud customer signal deep engineering coordination with NVIDIA [24]. Dell's global services organization and financing options, useful for enterprises without hyperscaler-grade data center operations teams, differentiate it from ODM-direct alternatives. The chief limitation is that AI server gross margins are thin industry-wide; Dell's ISG segment growth has come with gross margin dollars growing more slowly than revenue in dollar terms because of high AI server mix, a dynamic also visible at HPE and Supermicro [31]. Component and GPU allocation constraints, not unique to Dell, also mean order-to-delivery lead times can stretch even for a vendor with Dell's purchasing scale.
Supermicro
Capabilities
Supermicro (Super Micro Computer, Inc.) built its AI server franchise on "Server Building Block Solutions," a modular architecture letting customers configure form factor, processor, memory, GPU, storage, networking, power, and cooling independently [32]. The company offers NVIDIA HGX B300, B200, and GB200 NVL72 solutions and was among the first companies, alongside QCT, to bring NVIDIA's MGX modular reference architecture to market in 2023 [33] [34]. Supermicro's signature technical differentiator is direct liquid cooling (DLC): the company states it has deployed more than 100,000 NVIDIA GPUs with its DLC solution and delivered over 2,000 liquid-cooled racks since June 2024, with a design that can dissipate up to 1,600 W per cold plate for next-generation GPUs [35] [36]. Datacenter Dynamics reports that Supermicro claims to be the biggest global supplier of direct liquid cooling, though independent market-share verification for that specific claim was not available at the time of writing [37].
Adoption
Supermicro reported fiscal third-quarter 2026 (ended March 31, 2026) net sales of $10.2 billion, up 123% year over year, with AI GPU-related platforms contributing more than 80% of total revenue [38] [39]. Non-GAAP gross margin recovered to 10.1% after component shortages and customer site readiness delays pressured the prior quarter, and CEO Charles Liang pointed to new US manufacturing capacity in Silicon Valley as a driver of continued growth [40]. In IDC's Q1 2026 tracker, Supermicro retained second place in overall worldwide server revenue share at 7.6%, growing 128.9% year over year [41]. Supermicro's best-known AI deployment is xAI's Colossus cluster in Memphis, Tennessee, where its liquid-cooled 4U servers, each housing eight NVIDIA H100 GPUs, formed a substantial portion of the original 100,000-GPU buildout completed in just 122 days [42] [43]. In March 2025, Supermicro also formed a distribution partnership with Eviden to sell its GB200 NVL72 AI SuperCluster offering across Europe, India, the Middle East, and South America, expanding its geographic reach beyond direct sales [44].
Strengths and Limitations
Supermicro's core strength is speed to market on liquid cooling and rack configuration flexibility: the company claims a two-to-four-week lead time from order to shipment for DLC racks, versus what it describes as four months to a year historically for the wider industry [45]. Its limitations are governance and margin related: the company severed ties with a co-founder named in a federal indictment in March 2026, and its non-GAAP gross margin of roughly 10% trails Dell's and HPE's blended enterprise margins because Supermicro's revenue mix skews more heavily toward hardware-only, lower-margin AI GPU platforms and less toward services [46] [47]. Supermicro also lacks the enterprise services and financing depth of Dell and HPE, which matters for buyers that need long-term support contracts rather than hardware alone.
Hewlett Packard Enterprise (HPE)
Capabilities
HPE's flagship AI server is the Cray XD670, a direct-liquid-cooled system optimized for LLM training, natural language processing, and multimodal training, which delivered six number-one results in the MLPerf Inference v5.1 benchmark suite, including in computer vision and LLM chat question-and-answer and text generation categories [48]. HPE also sells "NVIDIA GB200 NVL72 by HPE," a fully integrated rack-scale system combining NVIDIA compute, networking, and software with HPE's own liquid-cooling and services expertise, and has announced "NVIDIA Vera Rubin NVL72 by HPE" for frontier models exceeding one trillion parameters [49]. HPE positions its offering around "HPE AI Factory," a full-stack bundle including GreenLake consumption-based management, and CEO Antonio Neri noted the company now considers itself the largest OEM partner of Broadcom in networking, reinforcing a broader compute-plus-networking-plus-storage sales motion rather than compute alone [50].
Adoption
In its fiscal second quarter of 2026 (ended April 30, 2026), HPE reported total revenue of $10.7 billion, up 40% year over year, a record for the company [51]. Within that total, the Cloud & AI segment generated $7.7 billion, up 22.9% year over year, with the server sub-segment contributing $5.5 billion, up 32.7% [52] [53]. On the earnings call, CFO Marie Myers and CEO Antonio Neri described a "very large backlog in servers" and said the "pipeline remains multiples of the current backlog, which is record-breaking at the company level," while raising full-year Cloud & AI revenue growth guidance to the low-20% range from a prior mid-to-high single-digit outlook [54] [55]. IDC's Q1 2026 tracker placed HPE fifth in overall worldwide server revenue share at 3.0%, up 17.2% year over year [56]. Named HPE AI infrastructure deployments include a collaboration with Japanese telecom operator KDDI to open the Osaka Sakai Data Center with a GB200 NVL72 platform by early 2026, and a sovereign AI factory built for the University of Utah using Cray XD670 servers and NVIDIA Hopper GPUs, expected to more than triple the university's computing capacity [57] [58].
Strengths and Limitations
HPE's principal strength is its multi-decade liquid-cooling and supercomputing pedigree from the Cray acquisition, combined with a networking portfolio strengthened by the Juniper Networks acquisition; Neri specifically credited "the strength of our combined networking portfolio" for the quarter's results [59]. HPE also explicitly prioritizes enterprise and sovereign AI customers over lower-margin service-provider deals, with CFO Myers noting that "enterprise and sovereign typically being a more profitable sort of part of the mix compared to, say, your classic service provider or model builder" [60]. The limitation of this strategy is scale: HPE's 3.0% overall server revenue share trails Dell and Supermicro by a wide margin, meaning HPE is less likely to win the largest hyperscaler-direct GPU deals and instead competes chiefly for enterprise, government, and sovereign AI factory contracts where its services model commands a premium [56].
Foxconn, Lenovo, and the Broader ODM and Component Ecosystem
Capabilities
Foxconn, officially Hon Hai Precision Industry Co., is the world's largest electronics manufacturer and functions as NVIDIA's primary rack assembly partner, alongside Supermicro and Chenbro, for compute tray and chassis production [61]. Bloomberg describes Hon Hai as "Nvidia Corp.'s server assembly partner," and the company is building its own showcase installation, the Hon Hai Kaohsiung Super Computing Center in Taiwan, featuring 64 racks and 4,608 Blackwell Tensor Core GPUs for an expected 90 exaflops of AI performance [62] [63]. Lenovo, another MGX ecosystem partner, offers the liquid-cooled ThinkSystem SC777 V4 Neptune, built on the NVIDIA GB200 platform, and has shipped the GB300 NVL72 (Type 7DJV), which integrates 72 Blackwell Ultra GPUs and 36 Grace processors into a single unified rack [64] [65]. Lenovo's Neptune liquid-cooling chassis, the ThinkSystem N1380, uses 100% direct water cooling and can reduce data center power consumption by up to 40%, enabling 100kW-plus racks without specialized air conditioning [66]. Below the branded OEM tier, NVIDIA's original MGX launch in May 2023 named ASRock Rack, ASUS, GIGABYTE, Pegatron, QCT, and Supermicro as first adopters, and both ASUS and GIGABYTE now ship their own GB300 NVL72 rack-scale products, the ASUS XA GB721-E2 and GIGABYTE GIGAPOD, each integrating 72 Blackwell Ultra GPUs and 36 Grace CPUs ([67] [68] [69]. Two other Taiwanese ODMs, Wiwynn and Quanta Cloud Technology (QCT), along with Wistron, round out the hyperscaler-direct supply base.
Adoption
Foxconn's scale in AI servers is exceptional even by industry standards. Chairman Young Liu has said AI rack shipments are on track to double in 2026, with the company claiming roughly 40% of global AI rack assembly, and Foxconn reported a 40% year-over-year jump in quarterly sales with June 2026 revenue alone reaching approximately NT$1.33 trillion (roughly $45 billion) [9] [70]. In its own first-quarter 2026 results, Hon Hai reported record revenue of NT$2.12 trillion, up 29% year over year, with the Cloud and Networking product segment, which includes AI servers, now accounting for nearly 50% of total revenue, and it forecasts full-year AI rack shipments to more than double in 2026 [71] [72] [73]. Wiwynn reported first-quarter 2026 consolidated revenue of NT$276.5 billion, up 62.0% year over year, a record for the period [74]. Quanta reported record first-quarter 2026 revenue of NT$809.22 billion (approximately $25.68 billion), up 66.6% year over year, with servers accounting for 80% of quarterly revenue, and executives said major cloud service providers now have order visibility through 2028 [75] [76]. In IDC's tracker, Lenovo moved to third place in overall worldwide server revenue share with 4.6%, growing 36.5% year over year [77].
Strengths and Limitations
Foxconn's strength is unmatched manufacturing scale and vertical integration, spanning chassis, power, and increasingly components such as optical modules and connectors, which lets it absorb enormous hyperscaler order volumes that branded OEMs cannot match on unit economics [78]. Its limitation, shared by Quanta and Wiwynn, is that ODM-direct business generally lacks the branded warranty, enterprise financing, and dedicated account services that Dell, HPE, and to a lesser extent Supermicro provide, which is why ODM Direct market share compressed from 64.1% to 50.2% as more buyers outside the largest hyperscalers opted for branded OEM support [3]. Lenovo's strength is its Neptune liquid-cooling heritage from decades of supercomputing deployments, but its 4.6% overall server share leaves it behind Dell and Supermicro in AI-specific volume [77]. Smaller MGX partners such as ASUS, GIGABYTE, and ASRock Rack compete chiefly on price and specialization for smaller deployments and channel/reseller markets rather than the largest gigawatt-scale contracts.
Feature Comparison
Table 1 below summarizes how the leading branded OEMs and principal ODMs compare on their flagship NVIDIA rack-scale platforms, cooling approach, disclosed financial scale, and market position as of mid-2026.

| Vendor | Flagship NVIDIA Rack Platform | Cooling | Recent Quarterly AI/Server Revenue Signal | Worldwide Server Revenue Share (Q1 2026, IDC) | Primary Buyer Profile |
|---|---|---|---|---|---|
| Dell Technologies | PowerEdge XE9712 / XE9812 (GB200, GB300, Vera Rubin NVL72) | Direct liquid cooling, ORv3 rack infrastructure | $16.1B AI server revenue recognized in Q1 FY27; $43B backlog entering FY27 [25] | 16.5% [27] | Hyperscalers, large enterprises, sovereign AI |
| Supermicro | GB200 NVL72 AI SuperCluster; HGX B300/B200 | Direct liquid cooling (DLC), pioneer since 2024 | $10.2B net sales in fiscal Q3 2026, >80% AI GPU-related [6] | 7.6% [79] | Neoclouds, CSPs, price-sensitive large deployments |
| HPE | NVIDIA GB200 NVL72 by HPE; Cray XD670 | Direct liquid cooling plus hybrid air/liquid options | $5.5B server revenue in Cloud & AI segment, Q2 FY26, up 32.7% [53] | 3.0% [80] | Enterprises, sovereign/government, telecom |
| Lenovo | ThinkSystem SC777 V4 Neptune; GB300 NVL72 (Type 7DJV) | Neptune direct water cooling, up to 40% power reduction [81] | 4.6% worldwide server revenue share; ranked third in IDC's Q1 2026 tracker [82] | 4.6% [82] | HPC labs, enterprises, research institutions |
| Foxconn (Hon Hai) | GB200/GB300 NVL72 rack assembly for hyperscalers | Liquid cooling per hyperscaler spec; own 800 VDC Kaohsiung-1 facility [83] | ~40% of global AI rack assembly, self-reported [84] | Included in ODM Direct, 50.2% of market [3] | Meta, Microsoft, Google, Oracle, hyperscaler-direct |
| Quanta / QCT | MGX-based S74G series; hyperscaler custom racks | Liquid cooling per customer spec | NT$809.22B (~$25.68B) Q1 2026 revenue, servers 80% of total [75] | Included in ODM Direct | Hyperscaler-direct, CSPs |
Table 1 shows that vendors may share NVIDIA GPU and rack-scale platform elements while offering materially different system configurations. NVIDIA MGX explicitly supports tailored combinations of GPUs, CPUs, networking, cooling, power, and other system elements; buyers should therefore compare the specific rack configuration, network fabric, storage, management software, support terms, validation results, and site requirements—not just the accelerator generation. Dell's $43 billion backlog and Foxconn's roughly 40% share of physical rack assembly represent two different kinds of market power: financial commitment capacity versus manufacturing throughput.
Performance and Benchmarks
Independent, apples-to-apples benchmarking across OEM systems is limited. Systems using the same NVIDIA accelerator generation can share core compute characteristics, but OEM configurations may differ in CPUs, networking, storage, cooling, power, management software, and workload tuning; these differences can affect measured performance and operational results. On the MLCommons MLPerf Inference v5.1 suite, HPE reports that its Cray XD670 delivered six number-one results, including in computer vision and LLM chat question-and-answer and text-generation tasks [85]. At the platform level, NVIDIA's published GB200 NVL72 specifications state 30x faster real-time trillion-parameter LLM inference, 4x faster LLM training, and 25x better energy efficiency versus H100 under NVIDIA's stated comparison conditions. These are platform-level claims, not proof that every OEM configuration will produce identical application performance or energy results [86].
At the rack level, CoreWeave's own technical documentation for its GB200 NVL72-powered cloud instances confirms 130 TB/s of total NVLink bandwidth and 13 TB of high-bandwidth GPU memory per rack, matching NVIDIA's reference specification regardless of whether the underlying hardware came from Dell, Supermicro, or another qualified OEM [87]. The successor GB300 NVL72 platform, which Dell, HPE, Lenovo, ASUS, and GIGABYTE all now offer, delivers up to a 50x overall increase in AI factory output performance compared to Hopper-generation platforms, according to NVIDIA's published specifications, again a chip-level improvement rather than an OEM-specific one [14]. Where OEMs do differentiate measurably is cost-efficiency claims for next-generation platforms: Dell states its PowerRack systems built on NVIDIA's forthcoming Vera Rubin NVL72 platform deliver up to 10x lower cost per token than Grace Blackwell NVL72 systems for large-scale agentic AI inference, a vendor claim not yet independently verified by third-party benchmarking as of this writing [21]. Buyers evaluating vendor performance claims should treat MLPerf submissions, which are audited by MLCommons, as the most rigorous available third-party comparison point, while treating vendor-issued cost-per-token or TCO figures as directional marketing claims pending independent replication.
Data Analysis and Evidence
The overall server market, encompassing both AI-accelerated and traditional systems, reached $122.6 billion in worldwide vendor revenue in the first quarter of 2026 according to IDC's Worldwide Quarterly Server Tracker, up 30.4% year over year [88]. Within that total, non-x86 servers, a category dominated by NVIDIA GPU and custom ASIC systems, reached $58.7 billion, up 107.6% year over year and now representing 47.9% of total market revenue, closing in on the traditional x86 segment, which actually declined 2.9% year over year to $63.9 billion as component supply constraints, particularly in DRAM and NAND flash, limited shipment volumes [89] [90]. GPU-accelerated servers specifically generated $68.9 billion, or 56.2% of total market revenue, up 24.8% year over year, while other accelerated (non-GPU, largely ASIC) servers surged 122.1% to $17.7 billion [13].
TrendForce's separate research, published in January 2026, forecasts global AI server shipments will grow more than 28% year over year in 2026, with total global server shipments including AI servers accelerating to 12.8% growth, driven by the combined capital expenditures of the top five North American cloud service providers (Google, AWS, Meta, Microsoft, and Oracle), which TrendForce expects to increase 40% year over year in 2026 [91] [92]. TrendForce also projects GPU-based systems will remain the leading AI server category at 69.7% of shipments in 2026, while ASIC-based systems, reflecting custom silicon from Google, Meta, and other hyperscalers, are expected to rise to 27.8% of shipments, the highest share since 2023 [93] [94]. This is a meaningful discrepancy worth noting honestly: TrendForce's forecast of 28% AI server shipment growth versus IDC's measured 30.4% overall server market revenue growth reflect different methodologies (unit shipment forecast versus vendor revenue actuals) and different scope (AI servers only versus the total server market), so the two figures are not directly comparable but both point in the same directional trend of continued rapid expansion.
Table 2 below consolidates the disclosed AI-related quarterly financial signals across the major branded OEMs, drawn directly from company filings and press releases, to give buyers a sense of relative financial momentum and disclosed backlog depth heading into the second half of 2026.
| Company | Most Recent Quarter (2026) | AI/Server-Related Revenue | Year-over-Year Growth | Disclosed Backlog / Orders Signal |
|---|---|---|---|---|
| Dell Technologies | Q1 FY27 (ended ~May 2026) | $16.1B AI server revenue recognized; $29B total ISG | 181% (ISG) [26] | $24.4B new AI orders booked; $51.3B backlog reported [95] |
| Supermicro | Fiscal Q3 2026 (ended Mar. 2026) | $10.2B total net sales, >80% AI GPU-related [6] | 123% [38] | Management cited record backlog, deferred revenue tied to site readiness [96] |
| HPE | Fiscal Q2 2026 (ended Apr. 2026) | $7.7B Cloud & AI segment; $5.5B server sub-segment [7] | 22.9% (segment); 32.7% (server) [53] | "Pipeline remains multiples of the current backlog, which is record-breaking" [8] |
| NVIDIA (for reference) | Fiscal Q1 2027 (ended Apr. 2026) | $75.2B Data Center revenue [17] | 92% [17] | Partner data centers over 10MW nearly doubled to more than 80 sites [97] |
| Hon Hai (Foxconn) | Q1 2026 | Cloud and Networking ~50% of NT$2.12 trillion revenue [72] | 29% (total revenue) [98] | AI rack shipments to more than double for full year 2026 [73] |
Interpreting Table 2, Dell's disclosed $51.3 billion backlog reported in its fiscal first quarter of 2027 call represents the single largest forward revenue commitment among branded OEMs covered here, though HPE and Supermicro both describe backlog as record-setting without disclosing comparably precise dollar figures in their public materials, an important limitation for any buyer trying to benchmark delivery timelines purely from public disclosures [95]. NVIDIA's own upstream growth rate, 92% year-over-year Data Center revenue growth, exceeds every downstream OEM's disclosed AI segment growth rate, underscoring that the constraint on the entire ecosystem remains GPU allocation rather than assembly capacity: NVIDIA reported that the number of partner data centers exceeding 10 megawatts of capacity nearly doubled in one year to more than 80 sites globally [97]. Rising per-rack prices reinforce this allocation dynamic: analysts at Morgan Stanley and Bernstein estimated NVIDIA's forthcoming Vera Rubin NVL72 rack could cost between $7.8 million and $9.1 million per unit by mid-2026, up sharply from Blackwell-era pricing, driven substantially by HBM4 memory costs projected to triple from roughly $16.6 per gigabyte to $53 per gigabyte by 2027 [99] [100]. For a full 1-gigawatt AI data center deployment, Bernstein estimated total infrastructure investment at $47.3 billion, up 17% from Blackwell-era costs of $40.5 billion, even as Vera Rubin's projected 3.5x compute efficiency gain is expected to improve return on investment per unit of compute capacity [101].
Case Studies and Real-World Examples
xAI Colossus: Dell and Supermicro Help Build an Initial 100,000-GPU Cluster in 122 Days
Elon Musk's xAI supercomputer, Colossus, located in Memphis, Tennessee, is the clearest public example of two competing OEMs building parallel infrastructure for the same customer. Both Dell Technologies and Supermicro were confirmed as server suppliers by Musk and Dell chairman and CEO Michael Dell in June 2024, with Michael Dell posting on X that Dell was "building a Dell AI factory with @nvidia to power @grok for @xai @elonmusk," while Musk confirmed Supermicro's involvement separately [102]. The initial buildout used Supermicro's liquid-cooled 4U servers, each containing eight NVIDIA H100 GPUs, arranged into racks of 512 GPUs, reaching 100,000 GPUs in just 122 days from groundbreaking, a construction pace Supermicro's technology partner ServeTheHome called notable "not just for its size but also for the speed at which it was built" [42] [103]. By February 2025, xAI had doubled Colossus to 200,000 GPUs, and the cluster's own published statistics claim 170 PB/s of aggregate memory bandwidth and more than 0.5 exabytes of storage for training data and checkpoints [104] [105]. As of May 2026, Wikipedia's tracking of the facility notes that Anthropic agreed to rent all compute capacity at the Colossus 1 data center, illustrating how multi-OEM AI factories increasingly serve as wholesale compute capacity for third parties beyond their original commissioning customer ([106]#:~:text=As%20of%20May%206%2C%202026%2C%20Anthropic%20has%20agreed%20to%20rent%20all%20compute%20capacity%20at%20the%20Colossus%201%20data%20center).
CoreWeave and Dell: First-to-Ship Status Across Three GPU Generations
CoreWeave, the AI-focused cloud provider, has become Dell's most publicly documented reference account for staying ahead of each NVIDIA rack generation. Dell first shipped thousands of PowerEdge XE9860 servers with NVIDIA H100 GPUs to CoreWeave in December 2023, then became the first vendor to ship PowerEdge XE9712 racks with GB200 NVL72 in December 2024, then the first to ship GB300 NVL72 in July 2025, and most recently the first to ship systems built on NVIDIA's next-generation Vera Rubin platform in June 2026, delivering PowerEdge XE9812-based PowerRack systems [107] [28] [108] [109]. CoreWeave separately became the first cloud provider to make GB200 NVL72-based instances generally available in February 2025, describing its buildout as scalable to 110,000 GPUs, using NVIDIA Quantum-2 InfiniBand at 400 Gbps per GPU [110]. This case demonstrates how a single AI-native cloud buyer can systematically extract "first-to-ship" positioning from an OEM partner across multiple silicon generations, a pattern of continuous co-engineering that smaller enterprise buyers are unlikely to replicate.
Foxconn's Hon Hai Kaohsiung Super Computing Center: Taiwan's Largest AI Supercomputer
Foxconn's own showcase deployment, the Hon Hai Kaohsiung Super Computing Center, revealed in 2024 at Hon Hai Tech Day, is built around NVIDIA's Blackwell architecture and the GB200 NVL72 platform, comprising a total of 64 racks and 4,608 Tensor Core GPUs, with an expected performance exceeding 90 exaflops of AI performance, which NVIDIA's own blog describes as making it "easily the fastest in Taiwan" [63] [111]. Foxconn plans to use the system for cancer research, LLM development, and smart-city applications, and Foxconn Vice President James Wu described it as "one of the most powerful in the world, representing a significant leap forward in AI computing and efficiency" [112]. Full deployment was targeted for 2026, illustrating how an ODM that spends most of its time assembling other companies' branded racks is simultaneously building sovereign-scale AI capacity domestically, partly to demonstrate its own engineering capability to hyperscaler customers evaluating ODM-direct purchasing [113].
KDDI and HPE: A Sovereign AI Data Center for the Japanese Telecom Market
Japanese telecommunications operator KDDI Corporation and HPE announced in June 2025 that they would jointly open the Osaka Sakai Data Center by early 2026, deploying a rack-scale system built on the NVIDIA GB200 NVL72 platform and constructed by HPE, using hybrid air- and liquid-cooling technology to reduce the facility's environmental footprint [57] [114]. KDDI intends to offer the resulting compute capacity through WAKONX, its AI-era business platform, to support startups and enterprises training large language models and generative AI systems in Japan [115]. This case demonstrates the OEM value proposition for regional telecom operators that need a trusted systems integrator with liquid-cooling expertise rather than a pure hardware transaction, since HPE President and CEO Antonio Neri framed the deal around "delivering powerful computing capabilities" rather than GPU count alone [116].
Microsoft Fairwater: A Hyperscaler-Built AI Factory at Gigawatt Scale
Microsoft's Fairwater data center campus in Mount Pleasant, Wisconsin, illustrates the largest hyperscaler category of buyer, one that increasingly designs its own infrastructure while sourcing components from the broader NVIDIA OEM and ODM ecosystem rather than purchasing turnkey racks from a single branded OEM. CEO Satya Nadella described Fairwater on social media as "the world's most powerful AI data center," which "will bring together hundreds of thousands of GB200s into a single seamless cluster," and the site went live ahead of schedule in mid-2026 after roughly two years of construction [117] [118]. Microsoft has described the project as representing "tens of billions of dollars of investments and hundreds of thousands of cutting-edge AI chips," connected to Microsoft's broader global cloud of more than 400 datacenters in 70 regions [119]. This case illustrates the ceiling of the OEM comparison: the very largest hyperscalers increasingly bypass fully branded OEM racks in favor of custom designs built with ODM partners such as Foxconn and Quanta, meaning the OEM competitive dynamics detailed elsewhere in this report apply most directly to enterprises, sovereign buyers, mid-sized clouds, and neoclouds rather than to the top four or five hyperscalers, which now represent their own distinct procurement category.
Implications and Future Directions
The near-term trajectory of the NVIDIA AI server OEM market is being reshaped by three forces converging simultaneously. First, NVIDIA itself is capturing more of the value chain by shipping increasingly complete rack systems rather than components for OEM integration, a shift Tom's Hardware describes as NVIDIA "moving closer to shipping entire full-scale systems," which compresses OEM assembly margins even as unit prices rise toward $8.8 million or more per Vera Rubin rack [120]. Second, the industry-wide transition to 800-volt direct current (VDC) power architecture for gigawatt-scale AI factories is drawing in an even broader ecosystem of partners beyond the traditional server OEMs, with more than 20 silicon, power system, and cooling partners, including Analog Devices, Infineon, Schneider Electric, Siemens, and Vertiv, participating alongside the core server vendors in NVIDIA's Kyber rack architecture transition planned for around 2027 [121] [122]. Third, sovereign AI initiatives are becoming a structurally distinct and insulated demand layer: IDC noted that government-directed programs to build nationally controlled AI compute infrastructure now span more than 40 countries, a category "largely insulated from commercial budget cycles," which favors OEMs like HPE and Dell with established government and public-sector sales channels over pure ODM-direct suppliers [123].
Memory pricing represents a growing risk to the entire OEM ecosystem's economics. Bernstein's June 2026 analysis projected HBM4 memory prices could triple from approximately $16.6 per gigabyte to $53 per gigabyte by 2027 as Vera Rubin ramps into volume production, which would push a single 1-gigawatt AI data center's total infrastructure cost to an estimated $47.3 billion, a 17% increase over Blackwell-generation costs [100] [101]. IDC separately flagged DRAM and NAND flash supply constraints as the principal cap on near-term non-accelerated server growth, a dynamic that could spill over into AI server component availability as memory manufacturers prioritize HBM allocation for AI accelerators over conventional DRAM [124]. For buyers, this suggests that locking in supply commitments and backlog priority earlier, rather than optimizing purely for unit price, will likely remain the dominant purchasing strategy through 2027, since IDC expects supply normalization to progress only gradually through 2027 as new fabrication capacity comes online [125].
Longer term, the growing share of ASIC-based AI servers, forecast by TrendForce to reach 27.8% of AI server shipments in 2026, the highest since 2023, represents a structural alternative to the NVIDIA OEM ecosystem entirely, as hyperscalers like Google expand in-house Tensor Processing Unit (TPU) silicon and increasingly sell that capacity to external customers such as Anthropic [94] [126]. This trend does not directly threaten the branded OEM and ODM vendors profiled in this report in the near term, since Google, Meta, and similar hyperscalers design and largely self-assemble their own ASIC infrastructure outside the traditional OEM channel, but it does cap the addressable market growth rate for NVIDIA-based OEM rack sales over the multi-year horizon.
Frequently Asked Questions (FAQs)
Who builds NVIDIA AI server racks? No single company builds all NVIDIA AI racks. Branded OEMs Dell, Supermicro, HPE, and Lenovo sell fully supported systems to enterprises and mid-sized cloud providers, while Taiwanese original design manufacturers Foxconn (Hon Hai), Quanta Cloud Technology, and Wiwynn assemble the majority of racks purchased directly by the largest hyperscalers such as Meta, Microsoft, Google, and Oracle [127] [128].
What is the best NVIDIA GB200 NVL72 OEM? There is no single best vendor. Qualified OEM systems can share the GB200 NVL72 platform, but configurations and buyer experience can differ in networking, storage, cooling, power, management software, support, delivery timing, and validated workload performance. Compare the proposed model and deployment scope directly. Dell has disclosed a large backlog and a first-to-ship track record with CoreWeave; Supermicro emphasizes liquid-cooling delivery speed; and HPE emphasizes enterprise services and Cray-based AI integration [4] [129] [85].
What is the difference between Supermicro and Dell AI servers? Supermicro sells hardware-centric, highly configurable Server Building Block Solutions with industry-leading liquid-cooling deployment speed, generating 80% of its revenue from AI GPU platforms, while Dell bundles rack-scale hardware with enterprise financing, professional services, and a broader AI Data Platform software stack, and posts a larger disclosed order backlog [130] [131].
What NVIDIA AI infrastructure does HPE offer? HPE offers "NVIDIA GB200 NVL72 by HPE" and the announced "NVIDIA Vera Rubin NVL72 by HPE" rack-scale systems, plus its own Cray XD670 AI training server, which posted six number-one results in the MLPerf Inference v5.1 benchmark suite [132] [85].
Does Foxconn build NVIDIA GB200 NVL72 racks? Yes. Foxconn (Hon Hai Precision Industry) is described by NVIDIA as a chassis and rack assembly partner for GB200 NVL72 systems alongside Supermicro and Chenbro, and Bloomberg describes Hon Hai directly as "Nvidia Corp.'s server assembly partner," with the company itself claiming roughly 40% of global AI rack assembly volume [61] [62] [84].
What is NVIDIA's market share among AI server OEMs? This question is often confused with server vendor market share; NVIDIA is the GPU supplier, not an OEM. Among branded server OEMs selling NVIDIA-based systems, IDC's Q1 2026 tracker shows Dell at 16.5%, Supermicro at 7.6%, Lenovo at 4.6%, IEIT Systems at 3.3%, and HPE at 3.0% of total worldwide server revenue, with unbranded "ODM Direct" vendors collectively holding 50.2% [27].
Conclusion
As of July 2026, the market for NVIDIA AI server OEMs has consolidated around a clear structure: a handful of branded system integrators, Dell, Supermicro, HPE, and Lenovo, compete for enterprise, sovereign, and mid-market cloud business by wrapping identical NVIDIA silicon in differentiated liquid cooling, services, and financing, while Taiwanese original design manufacturers Foxconn, Quanta, and Wiwynn continue to assemble the majority of racks purchased directly by the largest hyperscalers. Dell currently leads on disclosed financial scale, with a 16.5% worldwide server revenue share and a backlog exceeding $51 billion entering the second half of its fiscal year, while Supermicro leads on liquid-cooling deployment speed and Foxconn leads on raw manufacturing throughput, claiming roughly 40% of global AI rack assembly. HPE and Lenovo trail on volume but compete effectively for services-intensive sovereign and enterprise deals where their liquid-cooling pedigree and integration depth carry a premium.
For a buyer evaluating this market, the practical decision should compare the proposed system configuration, validated workload performance, networking and storage design, power and cooling requirements, management software, delivery timeline, services, regional support, and financing. NVIDIA MGX is an open modular reference architecture that lets partners build tailored systems; common NVIDIA platform elements do not establish identical OEM products or uniform availability. With AI server shipments forecast to grow more than 28% in 2026 and HBM memory costs threatening to push per-rack prices toward $9 million or higher for the next-generation Vera Rubin platform, the OEM landscape profiled in this report is likely to keep shifting quickly, and any comparison should be revisited against each vendor's most recent quarterly disclosures and model-specific documentation before a final purchasing decision is made.
External Sources
About GPUSmith
GPU Smith is an independent engineering firm that specifies, procures, integrates and validates private AI compute infrastructure on Nvidia reference architectures, from a single inference node to multi-megawatt compute halls. Every engagement is delivered against written acceptance criteria and an as-built documentation set, with procurement at a disclosed margin and no reseller quota or cloud of its own. Six disciplines: hardware integration and commissioning; cluster architecture and sizing; inference build-out; serving optimization; datacenter operations; and sovereign/air-gapped systems. Core thesis: at sustained load, the amortized cost of owned hardware falls below per-token cloud and API pricing, and GPU Smith locates that crossover for a defined workload and states build/no-build in writing. Sectors served: government and regulated enterprise (bounded inference), scaling AI teams past the ownership crossover, and investors/operators needing technical due diligence.
DISCLAIMER
This document is provided for informational purposes only. No representations or warranties are made regarding the accuracy, completeness, or reliability of its contents. Any use of this information is at your own risk. GPUSmith shall not be liable for any damages arising from the use of this document. This content may include material generated with assistance from artificial intelligence tools, which may contain errors or inaccuracies. Readers should verify critical information independently. All product names, trademarks, and registered trademarks mentioned are property of their respective owners and are used for identification purposes only. Use of these names does not imply endorsement. This document does not constitute professional or legal advice. For specific guidance related to your needs, please consult qualified professionals.