Where AI servers are actually built in America.

Every announced US AI-server manufacturing site we can document, with the disclosed investment and a source for each row. Nearshore Mexico plants are tracked separately: they serve the same North American demand. Updated 2026-07-15.

$4.0B+
disclosed US investment
20
US sites tracked
$1.4B+
disclosed Mexico investment
TX
the center of gravity: 8 of the largest sites

§ 01 · United States

VendorLocationDisclosed investmentNotesSource
Foxconn / IngrasysHouston, TX$450M~1M sq ft Ingrasys campus, ~600 jobstaiwannews.com.tw
Foxconn / IngrasysMount Pleasant, WI$569M1,374 jobs; former LCD site converted to AI server production, approved Nov 2025constructiondive.com
Foxconn / IngrasysLordstown, OHundisclosedFormer EV assembly plant converted to datacenter equipment productionhonhai.com
WistronFort Worth (AllianceTexas), TX$761MTwo sites, ~1.1M sq ft, 800+ jobs, targeted operational H1 2026fortworthedp.com
WistronDallas, TX$455MWistron InfoComm (USA) capital injection for server assemblyfinance.yahoo.com
CelesticaFort Worth, TX$876MTwo facilities, over 1M sq ft, tied to AI datacenter electronicscommunityimpact.com
WiwynnSocorro (El Paso), TX$300M866,000+ sq ft, 514 jobs, operations from H1 2026; Wiwynn's first US plantkvia.com
InventecKaty, TX$251MThree phases from an $85M initial approval, 2,300+ jobs plannedcoveringkaty.com
Compal ElectronicsTaylor and Georgetown, TX$235MRack-assembly plant (volume 2H2026) plus server service center, up to 1,000 jobsevertiq.com
PegatronGeorgetown/Blue Springs, TXundisclosedPlant and land purchased 2025, operational target 2026taiwannews.com.tw
Quanta / QCTFremont, CA$46M163,000 sq ft plant plus warehouse; $45.6M additional lease investment Sept 2025digitimes.com
MSICalifornia$65MSmall-volume server assembly from Q2 2026 ($65.2M property purchase)taipeitimes.com
SupermicroSan Jose, CAundisclosedThird Silicon Valley campus announced 2025, plus 8 additional US production facilities added 2025-2026supermicro.com
Dell TechnologiesAustin/Round Rock, TXundisclosedServer assembly near HQdell.com
HPEAguadilla, Puerto RicoundisclosedHPE-owned plant building motherboards and componentshpe.com
Hyve SolutionsFremont, CA and Olive Branch, MSundisclosedUS SMT lines; liquid-cooled NVIDIA GPU test pods from mid-2025hyvesolutions.com
FlexDallas, TXundisclosed400,000 sq ft grid-to-chip datacenter power plantdallasinnovates.com
AivresFremont, CAundisclosed270,828 sq ft assembly site at 47550 Kato Rdconnectcre.com
ZT SystemsSecaucus, NJ and TexasundisclosedManufacturing under Sanmina since Oct 2025; NVIDIA production restarts Sept 2026ir.sanmina.com
One Stop SystemsEscondido, CAundisclosedRugged GPU systems, AS9100D aerospace-certified design and manufacturingonestopsystems.com

§ 02 · Nearshore (Mexico)

VendorLocationDisclosed investmentNotesSource
Foxconn / IngrasysGuadalajara (El Salto), Mexico$900MDescribed as the world's largest GB200-class AI server assembly plant; supplies Stargatebloomberg.com
InventecCiudad Juarez, Mexico$450MMegasite campus, 45 production lines, 6,000+ jobs; ~35% of Inventec's global server outputmexicobusiness.news
WiwynnCiudad Juarez, MexicoundisclosedNorth America manufacturing center; Texas plant explicitly does not replace itwiwynn.com
WistronCiudad Juarez, Mexico$31MWistron InfoComm Mexico, leased facility, term 2026-2031en.wikipedia.org
PegatronMexicoundisclosedAI-server plant in mass production since Q3 2025, guided to ~5x the Taoyuan plant long-termtaipeitimes.com
LenovoMonterrey, MexicoundisclosedPlant plus AI Innovation Centre serving North Americanews.lenovo.com
CelesticaMonterrey, MexicoundisclosedOperating since 1998, continued AI infrastructure investmentglobenewswire.com

NOTE — Investment figures are as disclosed by the vendor or local press; undisclosed rows are excluded from the totals. A row here documents an announcement, not verified production volume. Know of a site we missed? [email protected].